Home27C23', 26 and 31' skiff'sSurface drive boatsduck skiffs30x10 flat work boatpage 1 C-27ft BOATT-Topspage 2 TUNA TUNApage 3 BAY BOATpage 4 27ft FULL CABINpage 5 BASS BOATSpage 6 BAY BOATpage 7 HAVING FUNpage 8 22' BAY BOATpage 9 JUST FISHING

TUNA DAWG

 


100_0143.jpg

First 3 coats of epoxy which will be sanded and another 3 coats to finish

100_0147.jpg

Finished exterior bottom and sides.

100_0163.jpg

The final coat of epoxy has been applied, next a gray nonslip surface epoxy will be added.

100_0169.jpg

Epoxy nonskid gray has been added to decks, floor will be finished after console is installed.

100_0643.jpg

100_0646.jpg

100_0648.jpg

100_0637.jpg